{"id":2386,"date":"2025-12-23T09:07:40","date_gmt":"2025-12-23T09:07:40","guid":{"rendered":"https:\/\/www.advantage.co.th\/?p=2386"},"modified":"2025-12-23T09:07:44","modified_gmt":"2025-12-23T09:07:44","slug":"document-review-planning-for-textile-quality-inspection","status":"publish","type":"post","link":"https:\/\/www.advantage.co.th\/en\/document-review-planning-for-textile-quality-inspection\/","title":{"rendered":"Document Review &amp; Planning for Textile Quality Inspection"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\"><strong>BREAKDOWN OF EACH SPECIFICATION DOCUMENT<\/strong><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>1. APPROVED LAB DIP\/SWATCH CARDS<\/strong><\/h3>\n\n\n\n<p><strong>Purpose:<\/strong>&nbsp;Establishes the&nbsp;<strong>color standard<\/strong>&nbsp;for all materials.<\/p>\n\n\n\n<p><strong>What to Review &amp; Verify:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Correct Dye Recipe:<\/strong>\u00a0Ensure factory received and used the exact approved dye formula<\/li>\n\n\n\n<li><strong>Color Standards Under Correct Lighting:<\/strong>\n<ul class=\"wp-block-list\">\n<li><strong>D65 (Daylight 6500K):<\/strong>\u00a0Primary standard for color evaluation<\/li>\n\n\n\n<li><strong>TL84 (Store Lighting):<\/strong>\u00a0How color appears in retail environments<\/li>\n\n\n\n<li><strong>UV Light:<\/strong>\u00a0Check for fluorescent whitening agents (FWAs)<\/li>\n\n\n\n<li><strong>Incandescent (A Light):<\/strong>\u00a0Home lighting conditions<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>Metamerism Check:<\/strong>\u00a0Does the color shift differently under different lights? This must be approved.<\/li>\n\n\n\n<li><strong>Physical Swatch Attachment:<\/strong>\u00a0Actual fabric swatch must be attached, not just Pantone numbers<\/li>\n\n\n\n<li><strong>Approval Sign-off:<\/strong>\u00a0Must have dated signatures from buyer&#8217;s technical\/design team<\/li>\n<\/ul>\n\n\n\n<p><strong>Inspection Impact:<\/strong>&nbsp;Without this, color rejections become subjective arguments. With it, you can use a light box to objectively say &#8220;this doesn&#8217;t match the approved swatch.&#8221;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>2. APPROVED STRIKE-OFF\/PRINT STRIKE-OFF<\/strong><\/h3>\n\n\n\n<p><strong>Purpose:<\/strong>&nbsp;Defines&nbsp;<strong>print, embroidery, or appliqu\u00e9 standards<\/strong>.<\/p>\n\n\n\n<p><strong>Critical Elements to Confirm:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Color Separation &amp; Registration:<\/strong>\u00a0For prints &#8211; are colors aligned correctly?<\/li>\n\n\n\n<li><strong>Print Technique Verification:<\/strong>\u00a0Screen print vs. digital vs. sublimation &#8211; each has different quality parameters<\/li>\n\n\n\n<li><strong>Embroidery Details:<\/strong>\n<ul class=\"wp-block-list\">\n<li>Stitch density (SPI &#8211; stitches per inch)<\/li>\n\n\n\n<li>Thread type and weight<\/li>\n\n\n\n<li>Underlay stitching requirements<\/li>\n\n\n\n<li>Backing material specification<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>Print Hand Feel:<\/strong>\u00a0Some prints change fabric hand (crackling effect, rubbery feel) &#8211; this must be intentionally approved<\/li>\n\n\n\n<li><strong>Size &amp; Placement:<\/strong>\u00a0Exact measurement from specific points (e.g., &#8220;print center 5cm below neckline&#8221;)<\/li>\n\n\n\n<li><strong>Repeat Pattern Alignment:<\/strong>\u00a0For all-over prints, verify pattern matches at seams<\/li>\n<\/ul>\n\n\n\n<p><strong>Inspection Impact:<\/strong>&nbsp;This document prevents &#8220;close enough&#8221; acceptance of prints. It provides millimeter-level precision requirements.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>3. APPROVED TRIM CARDS<\/strong><\/h3>\n\n\n\n<p><strong>Purpose:<\/strong>&nbsp;Standardizes&nbsp;<strong>all non-fabric components<\/strong>.<\/p>\n\n\n\n<p><strong>Component-by-Component Verification:<\/strong><\/p>\n\n\n\n<p><strong>A. Zippers:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Brand and style <\/li>\n\n\n\n<li>Tape color and composition<\/li>\n\n\n\n<li>Slider type (auto-lock, non-lock, reversible)<\/li>\n\n\n\n<li>Teeth material (metal, plastic, coil)<\/li>\n\n\n\n<li>Length tolerance (\u00b10.5cm typically)<\/li>\n\n\n\n<li>Puller design and attachment<\/li>\n<\/ul>\n\n\n\n<p><strong>B. Buttons\/Snaps\/Fasteners:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Material (plastic, metal, coconut, corozo)<\/li>\n\n\n\n<li>Exact color matching to approved sample<\/li>\n\n\n\n<li>Size in ligne (standard button measurement)<\/li>\n\n\n\n<li>Shank vs. flat button specification<\/li>\n\n\n\n<li>Snap brand and strength (pressure required)<\/li>\n\n\n\n<li>Metal content compliance (nickel-free for allergies)<\/li>\n<\/ul>\n\n\n\n<p><strong>C. Threads:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Fiber content (polyester core thread most common)<\/li>\n\n\n\n<li>Weight\/thickness (Tex number)<\/li>\n\n\n\n<li>Color matching to fabric or contrast specification<\/li>\n\n\n\n<li>Special thread requirements (high-tenacity, fire-retardant)<\/li>\n<\/ul>\n\n\n\n<p><strong>D. Labels:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Woven vs. printed labels<\/li>\n\n\n\n<li>Content accuracy (100% cotton, etc.)<\/li>\n\n\n\n<li>Care symbol correctness per region (US, EU, Japan differ)<\/li>\n\n\n\n<li>Size label font and color<\/li>\n\n\n\n<li>Brand label placement tolerance<\/li>\n<\/ul>\n\n\n\n<p><strong>E. Elastics:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Width and recovery specifications<\/li>\n\n\n\n<li>Rubber vs. spandex content<\/li>\n\n\n\n<li>Color fastness requirements<\/li>\n<\/ul>\n\n\n\n<p><strong>Inspection Impact:<\/strong>&nbsp;Trims are where factories often substitute to cut costs. Approved cards eliminate &#8220;it looks similar&#8221; substitutions.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>4. TECH PACK WITH DETAILED MEASUREMENTS (POM SHEET)<\/strong><\/h3>\n\n\n\n<p><strong>Purpose:<\/strong>&nbsp;The&nbsp;<strong>engineering blueprint<\/strong>&nbsp;of the garment.<\/p>\n\n\n\n<p><strong>Critical Analysis Areas:<\/strong><\/p>\n\n\n\n<p><strong>A. Measurement Points of Measure (POM):<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Tolerance Levels:<\/strong>\u00a0Each measurement should have acceptable variance (\u00b10.5cm, \u00b11cm, etc.)<\/li>\n\n\n\n<li><strong>Grade Rules:<\/strong>\u00a0How measurements change across sizes (size 6 to 8 increases by 2cm in bust)<\/li>\n\n\n\n<li><strong>Key Dimensions:<\/strong>\u00a0Identify which measurements are\u00a0<strong>structural<\/strong>\u00a0vs.\u00a0<strong>stylistic<\/strong>\n<ul class=\"wp-block-list\">\n<li><em>Structural:<\/em>\u00a0Bust\/chest, waist, hip, across shoulder<\/li>\n\n\n\n<li><em>Stylistic:<\/em>\u00a0Hem width, cuff opening, pocket placement<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<p><strong>B. Construction Details:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Stitch types for each seam (401 chainstitch, 301 lockstitch, 504 overedge)<\/li>\n\n\n\n<li>Seam allowances (\u7f1d\u4efd) for each seam<\/li>\n\n\n\n<li>Interlining\/fusing specifications<\/li>\n\n\n\n<li>Hem depths and finishing methods<\/li>\n<\/ul>\n\n\n\n<p><strong>C. Pattern &amp; Grain Alignment:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Pattern matching at side seams, sleeves, pockets<\/li>\n\n\n\n<li>Straight grain indicators on technical flats<\/li>\n\n\n\n<li>Bias cutting requirements<\/li>\n<\/ul>\n\n\n\n<p><strong>Inspection Impact:<\/strong>&nbsp;This document allows the inspector to measure objectively. Without it, a &#8220;small fit&#8221; complaint is subjective; with it, you can prove the garment is 2cm smaller than specified.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>5. APPROVED FABRIC QUALITY STANDARD<\/strong><\/h3>\n\n\n\n<p><strong>Purpose:<\/strong>&nbsp;Defines the&nbsp;<strong>raw material quality parameters<\/strong>.<\/p>\n\n\n\n<p><strong>Must-Include Specifications:<\/strong><\/p>\n\n\n\n<p><strong>A. Fabric Construction:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Yarn count (Ne 40\/1, etc.)<\/li>\n\n\n\n<li>Thread density (ends\/inch x picks\/inch)<\/li>\n\n\n\n<li>Weave\/knit structure (single jersey, twill, satin)<\/li>\n<\/ul>\n\n\n\n<p><strong>B. Physical Properties:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>GSM (Grams per Square Meter):<\/strong>\u00a0Weight tolerance (\u00b15% typically)<\/li>\n\n\n\n<li><strong>Shrinkage Allowance:<\/strong>\u00a0Maximum after 3 home washes (\u00b13% typically)<\/li>\n\n\n\n<li><strong>Tear\/Tensile Strength:<\/strong>\u00a0Minimum requirements<\/li>\n\n\n\n<li><strong>Color Fastness Ratings:<\/strong>\u00a0To washing, rubbing, light, perspiration\n<ul class=\"wp-block-list\">\n<li>Rating scale: 1 (poor) to 5 (excellent), with minimums specified<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<p><strong>C. Defect Allowance:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Acceptable defect types and frequency per linear yard<\/li>\n\n\n\n<li>Defect placement restrictions (no critical defects in visible areas)<\/li>\n<\/ul>\n\n\n\n<p><strong>D. Test Reports Requirement:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Which third-party lab tests are required (SGS, Bureau Veritas, etc.)<\/li>\n\n\n\n<li>Testing standards (AATCC, ISO, ASTM)<\/li>\n\n\n\n<li>When tests must be conducted (before cutting, during production)<\/li>\n<\/ul>\n\n\n\n<p><strong>Inspection Impact:<\/strong>&nbsp;This is your defense against inferior fabric substitution. You can reject based on failed GSM or shrinkage tests, not just &#8220;it feels thin.&#8221;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>6. PACKAGING SPECIFICATIONS<\/strong><\/h3>\n\n\n\n<p><strong>Purpose:<\/strong>&nbsp;Ensures&nbsp;<strong>product arrives in sellable condition<\/strong>.<\/p>\n\n\n\n<p><strong>Layer-by-Layer Verification:<\/strong><\/p>\n\n\n\n<p><strong>A. Primary Packaging (direct contact):<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Polybag thickness (0.025mm, 0.03mm, etc.)<\/li>\n\n\n\n<li>Polybag printing requirements (size stickers, logos, warning labels)<\/li>\n\n\n\n<li>Tissue paper quality and folding method<\/li>\n\n\n\n<li>Hanger type (specific brand\/model, color)<\/li>\n<\/ul>\n\n\n\n<p><strong>B. Secondary Packaging (cartoning):<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Carton quality (3-ply, 5-ply, moisture resistance)<\/li>\n\n\n\n<li>Packing method:\n<ul class=\"wp-block-list\">\n<li>Flat pack vs. hanging pack<\/li>\n\n\n\n<li>Size ratio assortment (S:M:L = 1:2:1)<\/li>\n\n\n\n<li>Color assortment per carton<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>Folding template for garments<\/li>\n<\/ul>\n\n\n\n<p><strong>C. Shipping Marks:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Exact information required on carton<\/li>\n\n\n\n<li>Barcode specification (type, placement, data)<\/li>\n\n\n\n<li>Palletization requirements (cartons per pallet, stretch wrap)<\/li>\n<\/ul>\n\n\n\n<p><strong>Inspection Impact:<\/strong>&nbsp;Poor packaging causes warehouse damage and increases retail labor. This document ensures the product is protected and retail-ready.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>7. PURCHASE ORDER WITH QUANTITY BREAKDOWN<\/strong><\/h3>\n\n\n\n<p><strong>Purpose:<\/strong>&nbsp;The&nbsp;<strong>commercial contract<\/strong>&nbsp;that ties everything together.<\/p>\n\n\n\n<p><strong>Critical Verification Points:<\/strong><\/p>\n\n\n\n<p><strong>A. Quantity &amp; Delivery:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Total quantity by style\/color\/size<\/li>\n\n\n\n<li>Delivery schedule (multiple shipments?)<\/li>\n\n\n\n<li>Percentage completion requirement for inspection (typically 80-100%)<\/li>\n<\/ul>\n\n\n\n<p><strong>B. Commercial Terms Linked to Quality:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Payment terms tied to inspection approval<\/li>\n\n\n\n<li>Penalty clauses for quality failures<\/li>\n\n\n\n<li>Retention policies for failed goods<\/li>\n<\/ul>\n\n\n\n<p><strong>C. Inspection Protocol Specifications:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>AQL levels specified in PO (not assumed)<\/li>\n\n\n\n<li>Who pays for inspection<\/li>\n\n\n\n<li>Corrective action requirements for failures<\/li>\n<\/ul>\n\n\n\n<p><strong>Inspection Impact:<\/strong>&nbsp;The PO gives you the&nbsp;<strong>authority<\/strong>&nbsp;to inspect and reject. It&#8217;s the commercial backbone that makes quality requirements enforceable.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>THE PLANNING PROCESS: TURNING DOCUMENTS INTO ACTION<\/strong><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Step 1: Document Gap Analysis<\/strong><\/h3>\n\n\n\n<ol start=\"1\" class=\"wp-block-list\">\n<li>Compare all documents for consistency<\/li>\n\n\n\n<li>Flag any contradictions (e.g., tech pack says 100% cotton but fabric standard mentions polyester blend)<\/li>\n\n\n\n<li>Resolve discrepancies with your design\/technical team\u00a0<strong>before<\/strong>\u00a0inspection<\/li>\n<\/ol>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Step 2: Create Inspection Checklist<\/strong><\/h3>\n\n\n\n<p>Transform each specification into checkable items:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Lab Dip \u2192 Color check under 4 light sources<\/li>\n\n\n\n<li>Tech Pack \u2192 15 specific measurements with tolerances<\/li>\n\n\n\n<li>Trim Cards \u2192 Physical comparison of 8 trim items<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Step 3: Define AQL Sampling Plan<\/strong><\/h3>\n\n\n\n<p>Based on PO quantity:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Determine sample size from AQL tables<\/li>\n\n\n\n<li>Decide defect classification:\n<ul class=\"wp-block-list\">\n<li><strong>Critical:<\/strong>\u00a0Safety, legal, functional failure (AQL 0.0)<\/li>\n\n\n\n<li><strong>Major:<\/strong>\u00a0Affects saleability or use (AQL 2.5)<\/li>\n\n\n\n<li><strong>Minor:<\/strong>\u00a0Minor appearance issues (AQL 4.0)<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Step 4: Prepare Testing Equipment<\/strong><\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Calibrate light box<\/li>\n\n\n\n<li>Prepare GSM cutter and scale<\/li>\n\n\n\n<li>Charge camera batteries<\/li>\n\n\n\n<li>Print measurement charts<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Step 5: Schedule with Factory<\/strong><\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Confirm 80-100% production complete<\/li>\n\n\n\n<li>Ensure all approved samples are available on-site<\/li>\n\n\n\n<li>Arrange proper inspection area with tables and lighting<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n","protected":false},"excerpt":{"rendered":"<p>BREAKDOWN OF EACH SPECIFICATION DOCUMENT 1. APPROVED LAB DIP\/SWATCH CARDS Purpose:&nbsp;Establishes the&nbsp;color standard&nbsp;for all materials. What to Review &amp; Verify: Inspection Impact:&nbsp;Without this, color rejections become subjective arguments. With it, you can use a light box to objectively say &#8220;this doesn&#8217;t match the approved swatch.&#8221; 2. APPROVED STRIKE-OFF\/PRINT STRIKE-OFF Purpose:&nbsp;Defines&nbsp;print, embroidery, or appliqu\u00e9 standards. Critical [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":2387,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[26],"tags":[],"class_list":["post-2386","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-knowledge"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Document Review &amp; Planning for Textile Quality Inspection - Advantage<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.advantage.co.th\/en\/document-review-planning-for-textile-quality-inspection\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Document Review &amp; Planning for Textile Quality Inspection - Advantage\" \/>\n<meta property=\"og:description\" content=\"BREAKDOWN OF EACH SPECIFICATION DOCUMENT 1. APPROVED LAB DIP\/SWATCH CARDS Purpose:&nbsp;Establishes the&nbsp;color standard&nbsp;for all materials. What to Review &amp; Verify: Inspection Impact:&nbsp;Without this, color rejections become subjective arguments. With it, you can use a light box to objectively say &#8220;this doesn&#8217;t match the approved swatch.&#8221; 2. APPROVED STRIKE-OFF\/PRINT STRIKE-OFF Purpose:&nbsp;Defines&nbsp;print, embroidery, or appliqu\u00e9 standards. Critical [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.advantage.co.th\/en\/document-review-planning-for-textile-quality-inspection\/\" \/>\n<meta property=\"og:site_name\" content=\"Advantage\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ACLinspection\" \/>\n<meta property=\"article:published_time\" content=\"2025-12-23T09:07:40+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-12-23T09:07:44+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.advantage.co.th\/wp-content\/uploads\/2025\/12\/LINE_ALBUM_Sewing-up-process-matchines-Ironing-and-100_-ins_251114_7.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"960\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin@advantage\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin@advantage\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.advantage.co.th\/th\/document-review-planning-for-textile-quality-inspection\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.advantage.co.th\/th\/document-review-planning-for-textile-quality-inspection\/\"},\"author\":{\"name\":\"admin@advantage\",\"@id\":\"https:\/\/www.advantage.co.th\/en\/#\/schema\/person\/5d079d592c12254a245bcb70f33fe3b8\"},\"headline\":\"Document Review &amp; Planning for Textile Quality Inspection\",\"datePublished\":\"2025-12-23T09:07:40+00:00\",\"dateModified\":\"2025-12-23T09:07:44+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.advantage.co.th\/th\/document-review-planning-for-textile-quality-inspection\/\"},\"wordCount\":1098,\"publisher\":{\"@id\":\"https:\/\/www.advantage.co.th\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.advantage.co.th\/th\/document-review-planning-for-textile-quality-inspection\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.advantage.co.th\/wp-content\/uploads\/2025\/12\/LINE_ALBUM_Sewing-up-process-matchines-Ironing-and-100_-ins_251114_7.jpg\",\"articleSection\":[\"Knowledge\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.advantage.co.th\/th\/document-review-planning-for-textile-quality-inspection\/\",\"url\":\"https:\/\/www.advantage.co.th\/th\/document-review-planning-for-textile-quality-inspection\/\",\"name\":\"Document Review &amp; Planning for Textile Quality Inspection - Advantage\",\"isPartOf\":{\"@id\":\"https:\/\/www.advantage.co.th\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.advantage.co.th\/th\/document-review-planning-for-textile-quality-inspection\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.advantage.co.th\/th\/document-review-planning-for-textile-quality-inspection\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.advantage.co.th\/wp-content\/uploads\/2025\/12\/LINE_ALBUM_Sewing-up-process-matchines-Ironing-and-100_-ins_251114_7.jpg\",\"datePublished\":\"2025-12-23T09:07:40+00:00\",\"dateModified\":\"2025-12-23T09:07:44+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.advantage.co.th\/th\/document-review-planning-for-textile-quality-inspection\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.advantage.co.th\/th\/document-review-planning-for-textile-quality-inspection\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.advantage.co.th\/th\/document-review-planning-for-textile-quality-inspection\/#primaryimage\",\"url\":\"https:\/\/www.advantage.co.th\/wp-content\/uploads\/2025\/12\/LINE_ALBUM_Sewing-up-process-matchines-Ironing-and-100_-ins_251114_7.jpg\",\"contentUrl\":\"https:\/\/www.advantage.co.th\/wp-content\/uploads\/2025\/12\/LINE_ALBUM_Sewing-up-process-matchines-Ironing-and-100_-ins_251114_7.jpg\",\"width\":1280,\"height\":960},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.advantage.co.th\/th\/document-review-planning-for-textile-quality-inspection\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.advantage.co.th\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Document Review &amp; Planning for Textile Quality Inspection\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.advantage.co.th\/en\/#website\",\"url\":\"https:\/\/www.advantage.co.th\/en\/\",\"name\":\"https:\/\/www.advantage.co.th\/\",\"description\":\"Quality in Quality Control and Inspection \",\"publisher\":{\"@id\":\"https:\/\/www.advantage.co.th\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.advantage.co.th\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.advantage.co.th\/en\/#organization\",\"name\":\"Advantage Co. Ltd\",\"url\":\"https:\/\/www.advantage.co.th\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.advantage.co.th\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.advantage.co.th\/wp-content\/uploads\/2025\/07\/261294102_1859549597585101_82764-e1751863923702.webp\",\"contentUrl\":\"https:\/\/www.advantage.co.th\/wp-content\/uploads\/2025\/07\/261294102_1859549597585101_82764-e1751863923702.webp\",\"width\":175,\"height\":125,\"caption\":\"Advantage Co. Ltd\"},\"image\":{\"@id\":\"https:\/\/www.advantage.co.th\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/ACLinspection\",\"https:\/\/www.linkedin.com\/in\/aclinspection\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.advantage.co.th\/en\/#\/schema\/person\/5d079d592c12254a245bcb70f33fe3b8\",\"name\":\"admin@advantage\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.advantage.co.th\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7932b2e116b076a54f452848eaabd5857f61bd957fe8a218faf216f24c9885bb?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7932b2e116b076a54f452848eaabd5857f61bd957fe8a218faf216f24c9885bb?s=96&d=mm&r=g\",\"caption\":\"admin@advantage\"},\"url\":\"https:\/\/www.advantage.co.th\/en\/author\/adminadvantage\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Document Review &amp; Planning for Textile Quality Inspection - Advantage","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.advantage.co.th\/en\/document-review-planning-for-textile-quality-inspection\/","og_locale":"en_US","og_type":"article","og_title":"Document Review &amp; Planning for Textile Quality Inspection - Advantage","og_description":"BREAKDOWN OF EACH SPECIFICATION DOCUMENT 1. APPROVED LAB DIP\/SWATCH CARDS Purpose:&nbsp;Establishes the&nbsp;color standard&nbsp;for all materials. What to Review &amp; Verify: Inspection Impact:&nbsp;Without this, color rejections become subjective arguments. With it, you can use a light box to objectively say &#8220;this doesn&#8217;t match the approved swatch.&#8221; 2. APPROVED STRIKE-OFF\/PRINT STRIKE-OFF Purpose:&nbsp;Defines&nbsp;print, embroidery, or appliqu\u00e9 standards. Critical [&hellip;]","og_url":"https:\/\/www.advantage.co.th\/en\/document-review-planning-for-textile-quality-inspection\/","og_site_name":"Advantage","article_publisher":"https:\/\/www.facebook.com\/ACLinspection","article_published_time":"2025-12-23T09:07:40+00:00","article_modified_time":"2025-12-23T09:07:44+00:00","og_image":[{"width":1280,"height":960,"url":"https:\/\/www.advantage.co.th\/wp-content\/uploads\/2025\/12\/LINE_ALBUM_Sewing-up-process-matchines-Ironing-and-100_-ins_251114_7.jpg","type":"image\/jpeg"}],"author":"admin@advantage","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin@advantage","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.advantage.co.th\/th\/document-review-planning-for-textile-quality-inspection\/#article","isPartOf":{"@id":"https:\/\/www.advantage.co.th\/th\/document-review-planning-for-textile-quality-inspection\/"},"author":{"name":"admin@advantage","@id":"https:\/\/www.advantage.co.th\/en\/#\/schema\/person\/5d079d592c12254a245bcb70f33fe3b8"},"headline":"Document Review &amp; Planning for Textile Quality Inspection","datePublished":"2025-12-23T09:07:40+00:00","dateModified":"2025-12-23T09:07:44+00:00","mainEntityOfPage":{"@id":"https:\/\/www.advantage.co.th\/th\/document-review-planning-for-textile-quality-inspection\/"},"wordCount":1098,"publisher":{"@id":"https:\/\/www.advantage.co.th\/en\/#organization"},"image":{"@id":"https:\/\/www.advantage.co.th\/th\/document-review-planning-for-textile-quality-inspection\/#primaryimage"},"thumbnailUrl":"https:\/\/www.advantage.co.th\/wp-content\/uploads\/2025\/12\/LINE_ALBUM_Sewing-up-process-matchines-Ironing-and-100_-ins_251114_7.jpg","articleSection":["Knowledge"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.advantage.co.th\/th\/document-review-planning-for-textile-quality-inspection\/","url":"https:\/\/www.advantage.co.th\/th\/document-review-planning-for-textile-quality-inspection\/","name":"Document Review &amp; Planning for Textile Quality Inspection - Advantage","isPartOf":{"@id":"https:\/\/www.advantage.co.th\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.advantage.co.th\/th\/document-review-planning-for-textile-quality-inspection\/#primaryimage"},"image":{"@id":"https:\/\/www.advantage.co.th\/th\/document-review-planning-for-textile-quality-inspection\/#primaryimage"},"thumbnailUrl":"https:\/\/www.advantage.co.th\/wp-content\/uploads\/2025\/12\/LINE_ALBUM_Sewing-up-process-matchines-Ironing-and-100_-ins_251114_7.jpg","datePublished":"2025-12-23T09:07:40+00:00","dateModified":"2025-12-23T09:07:44+00:00","breadcrumb":{"@id":"https:\/\/www.advantage.co.th\/th\/document-review-planning-for-textile-quality-inspection\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.advantage.co.th\/th\/document-review-planning-for-textile-quality-inspection\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.advantage.co.th\/th\/document-review-planning-for-textile-quality-inspection\/#primaryimage","url":"https:\/\/www.advantage.co.th\/wp-content\/uploads\/2025\/12\/LINE_ALBUM_Sewing-up-process-matchines-Ironing-and-100_-ins_251114_7.jpg","contentUrl":"https:\/\/www.advantage.co.th\/wp-content\/uploads\/2025\/12\/LINE_ALBUM_Sewing-up-process-matchines-Ironing-and-100_-ins_251114_7.jpg","width":1280,"height":960},{"@type":"BreadcrumbList","@id":"https:\/\/www.advantage.co.th\/th\/document-review-planning-for-textile-quality-inspection\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.advantage.co.th\/en\/"},{"@type":"ListItem","position":2,"name":"Document Review &amp; Planning for Textile Quality Inspection"}]},{"@type":"WebSite","@id":"https:\/\/www.advantage.co.th\/en\/#website","url":"https:\/\/www.advantage.co.th\/en\/","name":"https:\/\/www.advantage.co.th\/","description":"Quality in Quality Control and Inspection ","publisher":{"@id":"https:\/\/www.advantage.co.th\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.advantage.co.th\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.advantage.co.th\/en\/#organization","name":"Advantage Co. Ltd","url":"https:\/\/www.advantage.co.th\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.advantage.co.th\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.advantage.co.th\/wp-content\/uploads\/2025\/07\/261294102_1859549597585101_82764-e1751863923702.webp","contentUrl":"https:\/\/www.advantage.co.th\/wp-content\/uploads\/2025\/07\/261294102_1859549597585101_82764-e1751863923702.webp","width":175,"height":125,"caption":"Advantage Co. Ltd"},"image":{"@id":"https:\/\/www.advantage.co.th\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ACLinspection","https:\/\/www.linkedin.com\/in\/aclinspection\/"]},{"@type":"Person","@id":"https:\/\/www.advantage.co.th\/en\/#\/schema\/person\/5d079d592c12254a245bcb70f33fe3b8","name":"admin@advantage","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.advantage.co.th\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7932b2e116b076a54f452848eaabd5857f61bd957fe8a218faf216f24c9885bb?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7932b2e116b076a54f452848eaabd5857f61bd957fe8a218faf216f24c9885bb?s=96&d=mm&r=g","caption":"admin@advantage"},"url":"https:\/\/www.advantage.co.th\/en\/author\/adminadvantage\/"}]}},"_links":{"self":[{"href":"https:\/\/www.advantage.co.th\/en\/wp-json\/wp\/v2\/posts\/2386","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.advantage.co.th\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.advantage.co.th\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.advantage.co.th\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.advantage.co.th\/en\/wp-json\/wp\/v2\/comments?post=2386"}],"version-history":[{"count":1,"href":"https:\/\/www.advantage.co.th\/en\/wp-json\/wp\/v2\/posts\/2386\/revisions"}],"predecessor-version":[{"id":2388,"href":"https:\/\/www.advantage.co.th\/en\/wp-json\/wp\/v2\/posts\/2386\/revisions\/2388"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.advantage.co.th\/en\/wp-json\/wp\/v2\/media\/2387"}],"wp:attachment":[{"href":"https:\/\/www.advantage.co.th\/en\/wp-json\/wp\/v2\/media?parent=2386"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.advantage.co.th\/en\/wp-json\/wp\/v2\/categories?post=2386"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.advantage.co.th\/en\/wp-json\/wp\/v2\/tags?post=2386"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}